2600 Camino Ramon, San Ramon, CA 94583

Project

Smith Plaza Renovation – AT & T Corporate Headquarters

Project date(s)

2007 to 2012

Project Partners

Engineer

Technical Roof Services (Concord, California)

General Contractor

Roebbelen Construction

Owner

AT&T

Highlights

All of the existing concrete topping, pavers, plants, planters, fountains, tree wells, stairs, etc. were removed from the deck to expose the existing structural concrete.

Biggest Challenge

This unique project is a multi-phased plaza renovation project. An existing membrane failure and extraordinary leaks forced the Owner to renovate the plaza.

Project Details

The construction included new sloping for the entire plaza, new drain locations, waterproofing membrane (Laurenco) over the entire surface horizontal and planter wall surfaces, drainage layers, and precast and paver finishes. The extensive detailing from the design covered all aspects of the project.